Saturday, March 3, 2012

Assembly

I have been building pieces in my basement, and today it was nice and a weekend, so I went out and assembled most of them.  I was pleasantly surprised that they fit together.  Here are a couple pictures of the current state.  I need to put a couple 2x4's along each long side, and 1 on each short side and then I can start putting on the siding.  I have the siding for the long sides cut and ready to go. The short sides are rough cut.  Then I just have the roof to do.

I talked to the pier people, and they hope to have the pier to me next week, and the week after that is spring break here, so I'll be off work. I'd love to have it put together by the end of spring break (famous last words, I expect...)

The "stilts" sticking out the bottom will be buried and set in cement, and the lower rails will be on the ground.



No comments:

Post a Comment